Installation Startup Requirements and
Installation Instructions
for the
INSTALLATION CREWS
Prior
to the start of the job the installer is to check to see:
1.) The layout line is snapped and painted with clear acrylic spray to stop it from being washed away.
The layout line is
NOT the job of the INSTALLER.
2.) The panels are marked on the layout line , at each end, and that the vertical rebar dowels are properly placed. If the rebar dowels are not placed properly it is the responsibility of the G.C, or the G.C.'s appointee to get them properly installed.
Installation
Instructions
1.) Start installing at a corner, after the layout line has been established.
2.) Align the panels vertically at the corner and install clips as shown
3.) Slide this "L" corner piece into place, to the layout line.
4.) Install four(4) fasteners thru the bottom track into the slab Two as shown below, Two in the corner, that you
can't see in this picture.
5.) Shim under end vertical c-studs to make the vertical edges plumb where the next panels will be installed.
6.) Hold a "4 ft. level" as shown below to plumb walls.
7.) Install the vertical rebar that has a 12" bent end by either,(A) tying it to the rebar that is coming out of the slab, or, (B) by drilling a 3/4" hole - 6" deep even with the end of the panel, then blowing out the concrete dust, filling the hole with mixed epoxy that has a working/allowable load of 4,600 lbs pullout in 3,000 psi concrete, and placing the rebar into the hole.



Typical
Methods for Forming the Corners